Stripped back, and the floor going down
The inside of 976 Stone Church Rd E is down to the studs, which is the point at which a renovation stops looking like a house and starts looking like a plan. With the old walls out you can finally read the two program rooms at full size, and new subfloor is going down over the original boards.
- Interior taken back to the studs across the main floor
- New steel posts and a beam in the basement, carrying the floor above
- Subfloor being laid over the original boards
- New insulation going in, for warmth through the winter and cool through the summer
- Ground opened up outside, for the service line out to the City connection
- Window openings exposed, so the daylight in each room can be measured rather than guessed